Naknek Crossing Indermodal Economic Impact and Airport Use Study
Final Report

The final report can be downloaded by sections below.

A copy of the final report can be obtained on CD upon request by calling 1-888-PLANDOT (in Juneau call 465-4070) and providing a contact and mailing address.

File Type
Title
Main body draft report (89 pages, 5.3 mb)
Appendix A - Agency mailing list (2 pages, 43 kb)
Appendix B - Public Involvement (16 pages, 1.6 mb)
Appendix C - Community profile (30 pages, 339 kb)
Appendix D - Initial environmental evaluation (8 pages, 38 kb)
Appendix E - Bridge and road access (8 pages, 312 kb)
Appendix F - Aviation system analysis (44 pages, 3.14 mb)
Appendix G - Benefit-cost analysis (28 pages, 141 kb)
Appendix H - Potential sources for funding (20 pages, 102 kb)
Appendix I - Population projections and trip forecasts with bridge (12 pages, 103 kb)
Appendix J - Survey of borough residents (4 pages, 47 kb)

 

For additional info, contact:
Eric Taylor
Division of Program Development, DOT&PF
3132 Channel Drive Room 200
Juneau, AK 99801-7898
Fax: 465-6984 E-mail: eric_taylor@dot.state.ak.us