Unless otherwise noted, Time of Bid Opening 2:00 P.M. Prevailing Time.
TO OBTAIN BID DOCUMENTS LISTED BELOW, PLEASE CONTACT THE APPROPRIATE DOTPF PLANS ROOMS. THERE MAY BE A NON REFUNDABLE CHARGE.
CENTRAL REGION: Conference Room, Aviation Building, 4111 Aviation Ave., Anchorage, AK (907)269-0400
NORTHERN REGION: Main Conference Room, Room 204, 2301 Peger Rd., Fairbanks, AK (907)451-2247
SOUTHCOAST REGION: Conference Room, 6860 Glacier Highway, Juneau, AK (907)465-4488

Only the information published in the bid documents and contract documents issued by the Contracting Agency should be used as a basis for bid preparation.

  • SKAGWAY MINE MOUNTAIN REPEATER POWER SYSTEM UPGRADE Plan Holders List
    Project# / Federal#: 80665 / 0106036
    Region: Southcoast
    Bid Opening Date: 8/6/2015
    Advertise Date: 7/16/2015
    Description: This project includes the upgrade of the existing electrical system for the Mine Mountain Repeater in Skagway, Alaska. Electrical system upgrades include modifications to the existing electrical system at the DOT Maintenance Facility and repeater tower, and installation of approximately 7,000 linear feet of Type 2, MC Jacketed interlock cable from the DOT Maintenance Facility to the repeater tower.
    DBE Goals(%): 0.0
    On the Job Trainees/Apprentices (item 645): None
    Engineer's Estimate Range: Less than $200,000
    Addenda & Notices:
    7/16/2015: Bid Plans (4019 KB)
    7/16/2015: Bid Specifications (3005 KB)
    7/16/2015: Bid Packet (344 KB)
    7/24/2015: Notice to Bidders (7 KB)

  • SITKA BARANOF WARM SPRINGS HARBOR IMPROVEMENTS Plan Holders List
    Project# / Federal#: 68353 / N/A
    Region: Southcoast
    Bid Opening Date: 8/13/2015
    Advertise Date: 7/23/2015
    Description: This project includes a basic bid that would remove and replace the existing mooring float facility. The work consists of demolition of the existing timber float system and piling, steel gangway and part of the timber approach. The basic bid would construct new timber moorage, gangway, and seaplane floats, aluminum gangway, approach dock, steel piles, and water system.

    The project also includes two alternates. Alternate A would demolish part of the existing timber approach trestle and replace with a new aluminum catwalk and pipe pile bent. Alternate B would add an additional timber float segment and associated steel piles to the moorage float system provided in the basic bid.

    DBE Goals(%): 0.0
    On the Job Trainees/Apprentices (item 645): None
    Engineer's Estimate Range: $1,000,000 to $2,500,000
    Addenda & Notices:
    7/23/2015: Bid Plans (9424 KB)
    7/23/2015: Bid Specifications (10922 KB)
    7/23/2015: Bid Forms (591 KB)
    7/23/2015: Photos (13639 KB)
    7/23/2015: Existing As-Built Drawings (2535 KB)