Tentative Advertising ListBid CalendarBid ResultsStatus of Award

All Region Bid Calendar

As of: Wed Mar 4, 2015 at 01:39 PM AKST


Unless otherwise noted, Time of Bid Opening 2:00 P.M. Prevailing Time.
TO OBTAIN BID DOCUMENTS LISTED BELOW, PLEASE CONTACT THE APPROPRIATE DOTPF PLANS ROOMS. THERE MAY BE A NON REFUNDABLE CHARGE.
CENTRAL REGION: Conference Room, Aviation Building, 4111 Aviation Ave., Anchorage, AK (907)269-0400
NORTHERN REGION: Main Conference Room, Room 204, 2301 Peger Rd., Fairbanks, AK (907)451-2247
SOUTHCOAST REGION: Conference Room, 6860 Glacier Highway, Juneau, AK (907)465-4488

Only the information published in the bid documents and contract documents issued by the Contracting Agency should be used as a basis for bid preparation.

  • YANKOVICH/MILLER HILL MULTI-USE PATH Plan Holders List
    Project# / Federal#: 76707 / N/A
    Region: Northern
    Bid Opening Date: 3/3/2015
    Advertise Date: 2/10/2015
    Description: Construct a side path along Ballaine Road, Yankovich, Miller Hill, Sheep Creek, and West Tanana Loop.
    DBE Goals(%):N/A
    On the Job Trainees/Apprentices (item 645): None
    Engineer's Estimate Range: $1,000,000 to $2,500,000
    Addenda & Notices:
    2/10/2015: SPECIFICATIONS (15.9MB)
    2/10/2015: PLANS (19.2MB)
    2/10/2015: BID PACKET (965.0KB)
    2/10/2015: QUANTITY CALCULATIONS (1.1MB)
    2/10/2015: CROSS SECTIONS (918.0KB)
    2/24/2015: ADDENDUM 1 (14.8KB)
    2/24/2015: NOTICE TO BIDDERS 1 (15.8KB)

  • LAKE HOOD A-B PARKING REHABILITATION Plan Holders List
    Project# / Federal#: 54465 / N/A
    Region: Central
    Bid Opening Date: 3/4/2015
    Advertise Date: 1/29/2015
    Description: This federally funded project will rehabilitate Alpha and Bravo Parking Areas and repair storm drain outfalls to Lake Hood.

    Plans, Specs, Bid Packets and Addenda along with other additional information pertaining to the project may now be downloaded from this website in their entirety at no charge. Your company must self-register by clicking on the Plan Holders link above, or register with the Central Region Plans Room by faxing your request to (907) 269-0425 or calling (907) 269-0408 or your bid may not be accepted. Your fax must include your company name, contact name, mailing address, phone and fax number, and whether your company is registering as a General Contractor, Subcontractor or Supplier. You may not change or alter the downloaded bidding forms in any way. Electronic bids will not be accepted.

    Bidding documents may also be purchased for $100.00 per set, payable to the State of Alaska, from the Central Region Plans Room, 4111 Aviation Avenue, Anchorage, Alaska before 4:30 p.m. (907) 269-0408.
    DBE Goals(%): 17.8
    On the Job Trainees/Apprentices (item 645): None
    Engineer's Estimate Range: $5,000,000 to $10,000,000
    Addenda & Notices:
    1/29/2015: Advertising Package (rk)
    Project Manual (~126 Mb)
    Plans (~48 Mb)
    Bid Packet (~2 Mb)
    Erosion & Sediment Control Plan (~2 Mb)
    Quantity Computations (~0.2 Mb)
    Cross Sections (~0.5 Mb)
    Geotechnical Report (~3.5 Mb)
    Traffic Control Plan (~2.3 Mb)
    2/6/2015: Addendum 1: Contains a notice to bidders, questions & answers, replaces sheets A3, E1, E2, E3, E4, E5, and E6, inserts new Sheet E7 and Reference Drawings 10 & 11, makes changes to the Special Notice to Bidders, replaces the Bid Form, and makes changes to Sections 50 and 80 and Items F-175 and G-700. (rk)
    Addendum 1 (~11 Mb)
    2/6/2015: Notice to Bidders (faxed 2/6/2015): Addendum One has been posted in its entirety on our website. (zc)
    2/11/2015: Notice to Bidders (faxed 2/11/2015): Contains the sign-in sheet for the site visit of February 11, 2015. (rk)
    Notice to Bidders (~0.1 Mb)
    2/13/2015: Addendum 2: Makes a change to Sheet B1, replaces sheets C1 and E5, Replaces the Bid Schedule, and makes changes to Items F-175, P-170, P-650 and T-901. (rk)
    Addendum 2 (~1 Mb)
    2/13/2015: Notice to Bidders (faxed 2/13/2015): Addendum Two has been posted in its entirety on our website. (tb)
    2/19/2015: Notice to Bidders (faxed 2/19/2015): Bidders are hereby notified that the bid opening date is changed to February 25, 2015. (tb)
    2/23/2015: Notice to Bidders (faxed 2/23/2015): Bidders are hereby notified that the bid opening date is changed to February 27, 2015 at 2:00 p.m. Addendum to follow. (zc)
    2/25/2015: Addendum 3: Contains Questions and Answers, replaces Sheets C1, H4, H6, H7 and H8, Replaces the DBE Subcontractable Items form and Bid Schedule, makes changes to Items D-701, L-110, and L-150 and changes the bid opening date to March 4, 2015. (rk)
    Addendum 3 (~6 Mb)
    2/25/2015: Notice to Bidders (faxed 2/25/2015): Addendum Three has been posted in its entirety on our website. (tb)
    2/27/2015: Addendum 4 (faxed 2/27/2015): Contains Questions and Answers, and makes a change to Item L-110. (rk)
    Addendum 4 (~0.3 Mb)
    3/2/2015: Addendum 5 (faxed 3/2/2015): Contains a Question and Answer, and makes a change to Item P-650. (rk)
    Addendum 5 (~0.1 Mb)
    3/3/2015: Notice to Bidders (faxed 3/3/2015): Contains questions and answers and provides additional information for bidders. (rk)
    Notice to Bidders (~1 Mb)
    Project 56605 As-built Sheet (~2 Mb)
    Project 57701 As-built Sheet (~1 Mb)
    Project 52365 As-built Sheet (~0.3 Mb)

  • NORTHERN LIGHTS BLVD: FOREST PARK DR. TO LAKE OTIS PKWY. PAVEMENT PRESERVATION, PHASE 1 & BENSON BLVD: LOIS DR. TO LATOUCHE ST. PAVEMENT PRESERVATION, PHASE 1 Plan Holders List
    Project# / Federal#: 58496/58497 / N/A, 58496/58497 / 0540011
    Region: Central
    Bid Opening Date: 3/4/2015
    Advertise Date: 2/11/2015
    Description: This federally funded contract is comprised of two federally funded projects:

    Project 58496, Northern Lights Blvd: Forest Park to Lake Otis Pavement Preservation, Phase 1, consists of resurfacing a distance of approximately 3 miles. Work includes curb ramp improvements, milling, paving, guardrail end terminal replacement, automated traffic recorder replacement, signing, and striping.

    Project 58497, Benson Blvd: Lois Dr. to LaTouche St. Pavement Preservation, Phase 1, consists of resurfacing a distance of approximately 2 miles. Work includes curb ramp improvements, milling, paving, dig-out and repair of sections of the roadbed, automated traffic recorder replacement, signal system modifications, signing, and striping.

    Plans, Specs, Bid Packets and Addenda along with other additional information pertaining to the project may now be downloaded from this website in their entirety at no charge. Your company must self-register by clicking on the Plan Holders link above, or register with the Central Region Plans Room by faxing your request to (907) 269-0425 or calling (907) 269-0408 or your bid may not be accepted. Your fax must include your company name, contact name, mailing address, phone and fax number, and whether your company is registering as a General Contractor, Subcontractor or Supplier. You may not change or alter the downloaded bidding forms in any way. Electronic bids will not be accepted.

    Bidding documents may also be purchased for $100.00 per set, payable to the State of Alaska, from the Central Region Plans Room, 4111 Aviation Avenue, Anchorage, Alaska before 4:30 p.m. (907) 269-0408.
    DBE Goals(%): 11.9
    On the Job Trainees/Apprentices (item 645): 1 Hours: 500
    Engineer's Estimate Range: $5,000,000 to $10,000,000
    Addenda & Notices:
    2/11/2015: Advertising Package (rn):
    Bid Packet (~2 Mb)
    Specifications (~88 Mb)
    Plans Vol. 1(~41 Mb)
    Plans Vol. 2(~57 Mb)
    Quantity Computations (~6 Mb)
    TCP 58496(~2 Mb)
    TCP 58497(~2 Mb)
    58496 ESCP (~8 Mb)
    58497 ESCP (~38 Mb)
    3/2/2015: Addendum One. Removes, replaces and adds various plan sheets; revises specification sections 105 and 643 (rk).
    Addendum One. (~0.9 Mb)
    3/2/2015: Notice to Bidders (faxed 3/2/2015): Addendum One has been posted in its entirety on our website. (tb)

  • AMATS: EAGLE RIVER ROAD MP 0.0-5.3 PAVEMENT PRESERVATION Plan Holders List
    Project# / Federal#: 56185 / 0550016
    Region: Central
    Bid Opening Date: 3/11/2015
    Advertise Date: 2/18/2015
    Description: This federally funded project will mill and resurface the Eagle River Road from the Old Glenn Highway (M.P. 0.0) to M.P. 5.3. The project will also include improvements to guardrail, guardrail end treatments, dig-outs, drainage repair, sign replacement, and replacement striping.

    Plans, Specs, Bid Packets and Addenda along with other additional information pertaining to the project may now be downloaded from this website in their entirety at no charge. Your company must self-register by clicking on the Plan Holders link above, or register with the Central Region Plans Room by faxing your request to (907) 269-0425 or calling (907) 269-0408 or your bid may not be accepted. Your fax must include your company name, contact name, mailing address, phone and fax number, and whether your company is registering as a General Contractor, Subcontractor or Supplier. You may not change or alter the downloaded bidding forms in any way. Electronic bids will not be accepted.

    Bidding documents may also be purchased for $100.00 per set, payable to the State of Alaska, from the Central Region Plans Room, 4111 Aviation Avenue, Anchorage, Alaska before 4:30 p.m. (907) 269-0408.
    DBE Goals(%): 4.9
    On the Job Trainees/Apprentices (item 645): 1 Hours: 500
    Engineer's Estimate Range: $5,000,000 to $10,000,000
    Addenda & Notices:
    2/18/2015: Advertising Package (rn):
    Bid Packet (~2 Mb)
    Specifications (~102 Mb)
    Plans (~40 Mb)
    Quantity Computations (~8 Mb)
    Traffic Control Plan (~2 Mb)
    ESCP (~24 Mb)
    Materials Memo(~1 Mb)

  • HSIP: PARKS HIGHWAY GRADE SEPARATIONS 2014 DESIGN BUILD Plan Holders List
    Project# / Federal#: 58273 / 0A41033
    Region: Central
    Bid Opening Date: 3/23/2015
    Advertise Date: 1/23/2015
    Description: Sealed Proposals will be received in the offices of the Chief of Contracts at 4111 Aviation Avenue, Anchorage, Alaska until 4:00 pm on the date listed above.

    This federally funded contract requires the Design-Build Contractor to provide the necessary engineering, labor, equipment, and materials to design, construct, and warranty new Dual Track Grade Separations of the Parks Highway over the Alaska Railroad at two (2) locations; Montana Creek crossing at MP 91.6 Parks Highway, and Sunshine Crossing at MP 100.4 Parks Highway. Mandatory Warranty Work shall be performed for a period of five consecutive years after completion of construction.

    Plans, Specs, Bid Packets and Addenda along with other additional information pertaining to the project may now be downloaded from this website in their entirety at no charge. Your company must self-register by clicking on the Plan Holders link above, or register with the Central Region Plans Room by faxing your request to (907) 269-0425 or calling (907) 269-0408 or your proposal may not be accepted. Your fax must include your company name, contact name, mailing address, phone and fax number, and whether your company is registering as a General Contractor, Subcontractor or Supplier. You may not change or alter the downloaded proposal forms in any way. Electronic proposals will not be accepted.

    Proposal documents may also be purchased for $100.00 per set, payable to the State of Alaska, from the Central Region Plans Room, 4111 Aviation Avenue, Anchorage, Alaska before 4:30 p.m. (907) 269-0408.
    DBE Goals(%): 2.3
    On the Job Trainees/Apprentices (item 645): None
    Engineer's Estimate Range: $20,000,000 to $30,000,000
    Addenda & Notices:
    1/23/2015: RFP Package (rk):
    Bid Packet (~2 Mb)
    Project Manual Volume 1 (170 Mb)
    Project Manual Volume 2 (~124 Mb)
    ACAD file of MP 100.5 Topo(~3 Mb)
    ACAD file of ROW (~0.5 Mb)
    ACAD file of Topo combined (~7 Mb)
    1/30/2015: Addendum 1 (Faxed 01/30/2015): Contains questions & answers and makes a change to Section 106 (rk).
    Addendum No. 1 (~0.3 Mb)
    2/6/2015: Addendum 2: Contains a notice to bidders, questions & answers, makes changes to Section 00020, 00022, 00310, Section 103, Scope of Work, and Appendices 2-1 and 10-1. (rk):
    Addendum No. 2 (~15 Mb)
    Updated ACAD file of MP 100.5 Topo(~2 Mb)
    Updated ACAD file of Topo combined (~4 Mb)
    2/6/2015: Notice to Proposers (faxed 2/6/2015): Addendum Two has been posted in its entirety on our website. (zc)
    2/13/2015: Notice to Proposers (faxed 2/13/2015): Proposers are hereby notified that the proposal due date is changed to March 23, 2015. Project completion dates will be adjusted in an addendum to follow. (tb)
    2/20/2015: Addendum 3: Contains a notice to proposers, questions & answers, makes changes to Sections 00020, 00022, 00310, removes and replaces Section 120, makes changes to Scope of Work, and Appendices 10-1 and 20-1. (rk):
    Addendum No. 3 (~5 Mb)
    ARRC Estimated Costs (~0.1 Mb)
    2/20/2015: Notice to Proposers: (faxed 2/20/2015): Addendum Three has been posted in its entirety on our website. (tb)