Terminal Construction Standards
| Complete Terminal Construction Standards |
||
|
ADDENDUM NO. 1 ADDENDUM NO. 2 |
||
TABLE OF CONTENTS |
||
| DIVISION 0 | AIRPORT BUILDING PERMIT REQUIREMENTS | |
| 00700 | General Conditions |
Feb 2003 |
| 00701 | Design Standards |
Feb 2003 |
| 00702 | Signage and Graphics |
Feb 2003 |
| 00703 | Additional Airline Tenant Design Standards |
Feb 2003 |
| 00704 | Additional Retail Tenant Design Standards |
Feb 2003 |
| DIVISION 1 | GENERAL REQUIREMENTS | |
| 01010 | Summary of Work |
Feb 2003 |
| 01045 | Cutting and Patching |
Feb 2003 |
| 01500 | Construction Facilities & Temporary Controls |
Feb 2003 |
| 01540 | Security (Addendum No. 1) |
May 2003 |
| DIVISION 8 | DOORS AND WINDOWS | |
| 08710 | Door Hardware |
Feb 2003 |
| DIVISION 15 | MECHANICAL REQUIREMENTS | |
| 15010 | Mechanical Requirements |
Feb 2003 |
| 15060 | Supports, Anchors and Penetrations |
Feb 2003 |
| 15070 | Mechanical Sound, Vibration & Seismic Control |
Feb 2003 |
| 15075 | Mechanical Identification |
Feb 2003 |
| 15080 | Mechanical Insulation |
Feb 2003 |
| 15170 | Motors |
Feb 2003 |
| 15300 | Fire Protection |
Feb 2003 |
| 15400 | Plumbing |
Feb 2003 |
| 15450 | Plumbing Equipment |
Feb 2003 |
| 15455 | Oil Water Separators |
Feb 2003 |
| 15483 | Fuel Gas Systems |
Feb 2003 |
| 15510 | Hydronic Piping and Specialties |
Feb 2003 |
| 15540 | HVAC Pumps |
Feb 2003 |
| 15550 | Heat Generation |
Feb 2003 |
| 15560 | Direct Fired Gas Makeup Air Units |
Feb 2003 |
| 15640 | Chilled Water Cooling System |
Feb 2003 |
| 15720 | Component Air Handling Units |
Feb 2003 |
| 15730 | Equipment Room Air Conditioning Units |
Feb 2003 |
| 15830 | Terminal Heat Transfer Units |
Feb 2003 |
| 15850 | Fans |
Feb 2003 |
| 15880 | Air Distribution |
Feb 2003 |
| 15900 | HVAC Controls |
Feb 2003 |
| 15910 | Control Instrumentation and Hardware |
Feb 2003 |
| 15915 | Variable Frequency Drives |
Feb 2003 |
| 15940 | Sequences Of Operation |
Feb 2003 |
| 15945 | Controls Testing and Acceptance |
Feb 2003 |
| 15990 | Testing, Adjusting, and Balancing |
Feb 2003 |
| DIVISION 16 | ELECTRICAL REQUIREMENTS | |
| 16010 | Electrical Requirements |
Feb 2003 |
| 16050 | Basic Materials and Methods |
Feb 2003 |
| 16111 | Conduit and Fittings |
Feb 2003 |
| 16112 | Surface Raceway |
Feb 2003 |
| 16115 | Cable Tray |
Feb 2003 |
| 16120 | Wire and Cable |
Feb 2003 |
| 16131 | Outlet Boxes |
Feb 2003 |
| 16132 | Pull and Junction Boxes |
Feb 2003 |
| 16140 | Wiring Devices |
Feb 2003 |
| 16190 | Supporting Devices |
Feb 2003 |
| 16201 | Emergency/Standby Generating System |
Feb 2003 |
| 16425 | Distribution Switchboards |
Feb 2003 |
| 16440 | Disconnects |
Feb 2003 |
| 16450 | Grounding |
Feb 2003 |
| 16460 | Secondary Transformers |
Feb 2003 |
| 16470 | Panelboards |
Feb 2003 |
| 16471 | Transient Voltage Surge Suppression |
Feb 2003 |
| 16475 | Overcurrent Protective Devices |
Feb 2003 |
| 16480 | Motor Control Center |
Feb 2003 |
| 16485 | Motor Starters |
Feb 2003 |
| 16487 | Contactors |
Feb 2003 |
| 16500 | Lighting Fixtures |
Feb 2003 |
| 16501 | Lamps, Ballasts, Accessories |
Feb 2003 |
| 16723 | Addressable Fire Alarm System |
Feb 2003 |
| 16745 | Telecommunication Copper Cable Distribution (Addendum No. 2) |
Mar 2004 |
| 16747 | Telecommunication Fiber Optic Distribution (Addendum No. 2) |
Mar 2004 |
| 16748 | Communications Cable Management Documentation (Addendum No. 2) |
Mar 2004 |
| 16770 | Airport Paging Announcement Control System |
Feb 2003 |
| 16920 | Power Monitoring and Control System |
Feb 2003 |
|
||
| APPENDICES | ||
| Appendix A | ||
| Appendix B | Certification of Compliance (Addendum No. 2) |
Mar 2004 |
| Waiver from Terminal Construction Standards (Addendum No. 2) |
Mar 2004 |
|
| Permission to Proceed |
Feb 2003 |
|
| Appendix C | ANC Telecommunications (Addendum No. 2) |
Mar 2004 |
| Appendix D | Concourse C Structural Limitations (Addendum No. 2) |
Mar 2004 |

